
Sonoran Metro Water: 58% reduction in emergency main breaks over 18 months
A 47,000-connection municipal utility in the greater Phoenix metro deployed Watsynq across 280 distribution segments. Risk-prioritized capital replacement of the top 22 segments produced a 58% reduction in break events by month 18 — and a successful rate increase justified by quantitative risk data.